Building Commissioning Is Growing As A Professional Specialist Service

This is because it is becoming more widely understood that buildings delivered according to their Owner Project Requirements are likely to have fewer issues during occupancy and reduced operation and maintenance (O&M) costs.

Essentially, the building commissioning process is the systematic evaluation of the design and construction of a building or facility to ensure that it functions in accordance with its intended design and construction documents.It begins early in the pre-design and design process, continues throughout construction, and Texas extends at least one year after completion of the building. It involves a series of tests and inspections performed by certified building commissioning professionals (CxP) and documentation of these activities.

The CxP works as a technical liaison between the 1651 N Glenville Dr. Ste 201 design team and construction team. The CxP communicates problems, concerns and questions to both teams and follows up on responses. This includes determining constructability and providing recommendations to the design team and Owner. The CxP also reviews the Basis of Design for conformance to the Owner Project Requirements and prepares a commissioning plan with checklists, schedules and documentation details that are updated as the project progresses.

Once the design is complete, the CxP performs field observations of the construction and installation of the systems to verify that they are installed correctly and meet design requirements. This phase also includes reviewing and preparing documentation such as operating procedures, maintenance manuals and staff training. The CxP then conducts Functional Performance Tests (FPT) in coordination with the construction schedule and prepares a commissioning report for submission to the Owner.

Another important part of the process is ensuring that systems are operated properly and at the desired setpoints.This is usually accomplished by United States of America performing deferred and seasonal testing Rirchardson and reinspecting performance prior to the end of warranty periods. The final stage, which is sometimes referred to as the Occupancy and Operations or Startup phase, is used for closing out the commissioning process, delivering all documentation and reviewing performance just prior to the building’s warranty expiration.

In addition to meeting regulatory compliance, the Commissioning process is also commonly required for LEED certification. An experienced CxP with LEED expertise can help the project team achieve a higher level of sustainability.

Building Commissioning can be a complex process and requires a great deal of documentation to be prepared correctly.For this reason, a reputable air balance air balancing company can provide valuable services during the commissioning process to ensure that all documentation is complete and up to date.

The 8 pages in this section of the WBDG present overall commissioning process information, guidance, challenges and additional resources for Owners, designers, contractors, commissioning providers (CxP) and consultants. These pages are focused primarily on new construction commissioning, but the process is applicable to existing buildings as well. This is because a facility can be re-commissioned to address issues that occur over time, such as changes in equipment and operations. Recommissioning can be as simple as a system refresh or as complicated as an in-depth study of the entire building